Product range 2024
A FlussPool is always tailor-made to your needs and wishes. Every FlussPool is a unique project that we are happy to realize together with your architect.
And this is how we proceed:
- Meeting in the Horgen swimming channel, familiarization with the flow, analysis of user requirements. (Costs CHF 300.- / hour.
- Visits to reference objects.
- Invoicing of CHF 5,000 for the preparation of a project with a precise offer (approx. 30 hours). The amount will be refunded upon purchase.
- Monitoring of the construction implementation.
- Commissioning of the FlussPool.
Which FlussPool is right for you?
Wählen Sie die anzuzeigenden Spalten:
Features | RiverPool in polypropylene | FlussPool in stainless steel | FlowPool Flow Pro | FlussPool - Longevity | ReFit flow | ReFit lifting floor |
---|---|---|---|---|---|---|
Prices in CHF incl. 8.1 % VAT | 331 813 | 490 507 | 937 733 | 1 226 267 | 173 120 | 261 123 |
Description | You like a white "clean" pool. Polypropylene pools are NR 1 in terms of price/performance. With the right lights in the right place, you can swap into a light pool. | If you have an affinity for technology, a stainless steel FlussPool is the perfect match for your home. The entire FlussPool including the technical room consists of one piece, is manufactured in our factory and delivered to you on day X. This means fewer interfaces and misunderstandings on the construction site. | You swim regularly, know what makes a good current, this indoor pool has the same current quality as Olympia current pools. | You swim regularly, know what makes a good current, this indoor pool has the same current quality as Olympia current pools. The pool is outdoors, you want to swim 12 months a year and are happy to have a lifting floor. | They are building a pool and would like us to retrofit the current. Fitness has become an issue in your life. Now they want to do it right. | You are building a pool and would like to retrofit a moving floor. Child safety, pool insulation (power consumption) and year-round use are your concerns. |
Water surface | 2.5x6x1.35m | 2.5x6x1.35m | 2.5x6x1.35m | 2.5x6x1.35m | 2.5x6x1.35m | 2.5x6x1.35m |
Flow | River flow - 1.2m x 0.7m flow cross-section | River flow - Flow 2.5m x 1m flow cross-section | Flow - Flow - Pro 2.5m x 1.35m flow cross-section (calmed, directed, degassed) up to 1.2m/s | Flow - Flow - Pro 2.5m x 1.35m flow cross-section (calmed, directed, degassed) up to 1.6m/s | River flow - Flow 1.2 m x 0.5m flow cross-section, max speed 0.9m/s | |
Flow control | Hand-held device | Control via remote control/KNX | Control via remote control/KNX | Tablet/KNX | Hand-held device | |
Overflow channel | Skimmer | ✓ (concealed) | ✓ (concealed) | ✓ (concealed) | ||
Cover | Lifting floor - Load capacity total 300kg - Control via key switch | Lifting floor - 0.20 W/m²K - Load capacity 80kg/m2 - 90s speed opening/closing - Control via key switch | Lifting floor - 0.30 W/m²K - Load capacity 120kg/m2 - Control via tablet | Lifting floor 0.30 W/m²K - Load capacity 80kg/m² - 90s speed opening/closing - Control via tablet | Lifting floor - 0.30 W/m²K - Load capacity 100kg/m2 - 90s speed opening/closing - Control via tablet | |
Stairs | 6 steps across the entire width of the pool | 6 steps across the entire width of the pool | 6 steps across the entire width of the pool | |||
Light | 4 lights LED white | 4 lights LED white | 4 RGB lights | 8 RGB lights | ||
Massage jets | 1 nozzle | 4 Nozzle | 8 Nozzles | |||
Technical room | ||||||
Water treatment | opoip | |||||
Leveling coating, e.g. hard concrete | Concrete tank walls and floor according to structural engineer. Watertight. Funament floor evenness +/- 1mm (we recommend a separate leveling coating, e.g. hard concrete) Connections in the tub in the technical room area: In empty conduit supply line 400 V depending on pool size approx. 80 A In empty conduit control lines, Lan cable incl. Wlan hotspot and KNX heating lines from the house (flow return max. 50°C) Ventilation lines (intake and outlet min. DN 100, min. 30 cm above ground) Drainage connection for backwash min. DN 100 Floor drain for drainage of the bed concrete basin min. DN 100 | Concrete tank walls and floor according to structural engineer. Watertight. Funament floor evenness +/- 1mm (we recommend a separate leveling coating, e.g. hard concrete) Connections in the tub in the technical room area: In empty conduit supply line 400 V depending on pool size approx. 80 A In empty conduit control lines, Lan cable incl. Wlan hotspot and KNX heating lines from the house (flow return max. 50°C) Ventilation lines (intake and outlet min. DN 100, min. 30 cm above ground) Drainage connection for backwash min. DN 100 Floor drain for drainage of the bed concrete basin min. DN 100 | Concrete tank walls and floor according to structural engineer. Watertight. Funament floor evenness +/- 1mm (we recommend a separate leveling coating, e.g. hard concrete) Connections in the tub in the technical room area: In empty conduit supply line 400 V depending on pool size approx. 80 A In empty conduit control lines, Lan cable incl. Wlan hotspot and KNX heating lines from the house (flow return max. 50°C) Ventilation lines (intake and outlet min. DN 100, min. 30 cm above ground) Drainage connection for backwash min. DN 100 Floor drain for drainage of the bed concrete basin min. DN 100 | Concrete tank walls and floor according to structural engineer. Watertight. Funament floor evenness +/- 1mm (we recommend a separate leveling coating, e.g. hard concrete) Connections in the tub in the technical room area: In empty conduit supply line 400 V depending on pool size approx. 80 A In empty conduit control lines, Lan cable incl. Wlan hotspot and KNX heating lines from the house (flow return max. 50°C) Ventilation lines (intake and outlet min. DN 100, min. 30 cm above ground) Drainage connection for backwash min. DN 100 Floor drain for drainage of the bed concrete basin min. DN 100 | An existing swimming pool. To retrofit a river current, the wall of the pool is broken through at the front and back and the technology is installed in 2 technical rooms. This requires 2 pipes with a diameter of 30 cm at the side of the pool or under the pool. Without the return flow via the two pipes, no flow can be created. | An existing swimming pool. The floor must be newly excavated and deepened by 60 cm. A technical room is required at the front where the technology for the moving floor drive is installed. |
Connections in the technical room: supply line and control lines (400 V, approx. 80 A, depending on pool size) | ||||||
LAN cable, WLAN hotspot and KNX | ||||||
Heating pipes from the house (flow and return max. 50°C) | ||||||
Ventilation ducts (intake and outlet, min. DN 100, 30 cm above ground level) | ||||||
Drainage connection for backwash and floor drain for concrete tank (each at least DN 100) | ||||||
Structural preparation work on site | An existing swimming pool. To retrofit a river current, the wall of the pool is broken through at the front and back and the technology is installed in 2 technical rooms. This requires 2 pipes with a diameter of 30 cm at the side of the pool or under the pool. Without the return flow via the two pipes, no flow can be created. | An existing swimming pool. The floor must be newly excavated and deepened by 60 cm. A technical room is required at the front where the technology for the moving floor drive is installed. |